Casablanca-fan-company HM 71 Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Faksy Casablanca-fan-company HM 71. Casablanca Fan Company HM 71 User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - HeatMaster

66401100excellence in hot waterInstallation, Operating andServicing InstructionsHeatMasterHM 71HM 101

Strona 2

HEATING CONNECTIONThe HeatMaster has two connections at the rear that can be used toconnect a central heating circuit. Connecting a heating system may

Strona 3 - CONSTRUCTION FEATURES

10ELECTRICAL CONNECTIONPower supplyThe boiler operates with a 230 V - 50 Hz single phase supply.A double pole isolator with a 6 amp fuse or a 6 amp MC

Strona 4

7 8 9 10 11 12L1 N T1 T2 S3 B4L1 N T1 T2 S3 B41 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 201 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 1 2 3

Strona 5 - GENERAL FEATURES

12COMMISSIONINGFILLING THE HOT WATER AND HEATING CIRCUITSIMPORTANTThe hot water tank must be pressurised before theheating circuit is filled.1. Close

Strona 6 - MAXIMUM OPERATING CONDITIONS

13BURNER FEATURES71/101 Gas burner features(*) propaneGas categoryType HM 71 HM 101Input Kw 22.0 - 69.9 25.0 - 107 / 22.0 - 110 (*)Output Kw 18.4 - 63

Strona 7 - CHIMNEY CONNECTIONS

14DRAINING THE BOILERWater flowing out of the drain cock may beextremely hot and could cause severe scalding.Keep people away from discharges of hotwa

Strona 8

15USING THE BOILERYour system should be serviced at least once a yearby a qualified engineer.If the boiler is subject to heavy use, it may requireserv

Strona 9 - HOT WATER CONNECTIONS

Changing the MCBA settings: Parameter modeProceed as follows:• Press the “MODE” button once; the display will show “PARA”.Press the “STEP” button onc

Strona 10 - INSTALLATION

17USER GUIDEcodes000203-07111213-171819252831323336373844Error descriptionNo flame detectedNo ignition after 5 attemptsInternal errorEprom errorLow wa

Strona 11 - ELECTRICAL CONNECTION

18SERVICE RECORDDate installed:% CO2 (min. load) :% CO2 (max. load) :GasLPGModel :Serial number :Heating system pressure setting :❏❏Name and signature

Strona 12

1INTENDED USERS OF THESE INSTRUCTIONSThese instructions are intended for- specifying engineers- installing engineers- end-users- servicing engineersSY

Strona 13 - BURNER FEATURES

INTERNATIONALACV international n.vKERKPLEIN, 39B-1601 RUISBROEK - BELGIUMTEL.: +32 2 334 82 20FAX: +32 2 378 16 49E-MAIL: international.info@acv-world

Strona 14

OPERATING PRINCIPLEThe HeatMaster is a high performance, direct fired hot water storageheater, which has indirect heat transfer due to its Tank-in-Tan

Strona 15 - Draining the heating circuit

3DESCRIPTIONFlue reduction collarTop coverAutomatic air ventCentral heating flow pipeFlue pipes and turbulatorsInsulationBurnerDetector NTC3Heating re

Strona 16 - USER GUIDE

4DIMENSIONSThe units are delivered fully assembled, tested and packed on a timber base with shockproof edges and protected by heat-shrunk plastic fil

Strona 17 - CONTROL SETTINGS

5HEATMASTER CONTROL SETTINGSDescriptionThe 71/101 series is fitted with an electronic controller (MCBA)which controls burner operation (ignition, safe

Strona 18

6BOILER ROOMImportant•Keep vents free at all times.• Do not store inflammable products in the boiler room.• Do not store corrosive products near the b

Strona 19 - INSTALLATION DETAILS

7INSTALLATIONBalanced flue boiler connection type: C• C13: concentric horizontal connection• C33: concentric vetical connection• C53: parallel chimney

Strona 20

8INSTALLATIONHOT WATER CONNECTIONSPressure reducing valveIf the mains water pressure is greater than 6 bar, a pressure reducingvalve must be fitted.Ex

Powiązane modele: HM 101

Komentarze do niniejszej Instrukcji

Brak uwag